What the factory runs on.

WHY IT DESERVES SEPARATE ATTENTION

Manufacturing is power-intensive, and supply is unreliable.

WHAT TO ESTABLISH

Total connected load Load during normal operation Starting loads of large motors

WHY STARTING LOADS

Motors draw far more on starting, and generators sized on running load fail.

WHAT TO CALCULATE

Generator capacity including starting requirements.

WHAT TO ESTABLISH ABOUT SEQUENCING

That large motors start in sequence, not together.

WHY

It reduces the peak demand substantially.

WHAT TO PROTECT

Equipment against voltage fluctuation.

WHY

Fluctuation damages motors, drives and controls.

WHAT INTERRUPTION COSTS

Material in process, frequently Restart time The output lost

WHY MATERIAL IN PROCESS

Some processes cannot be interrupted without scrapping the batch.

WHAT TO ESTABLISH

Which processes those are, and what protection they require.

WHAT TO CALCULATE

Cost per hour of downtime.

WHAT THAT JUSTIFIES

Backup investment.

WHAT TO MEASURE

Power consumed per unit produced.

WHY

It reveals efficiency and it identifies equipment problems.

WHAT TO EXAMINE

Equipment running when it need not Compressed air leaks Lighting and cooling of unused areas Peak demand charges, where they apply

WHY COMPRESSED AIR

Leaks are invisible, constant and expensive.

WHAT WATER REQUIRES

Adequate supply and storage Quality appropriate to the use Treatment, where the process requires it

WHAT TO PLAN

Operation during interruption.