Managing Production Scheduling Print

  • 0

Deciding what to make and when.

WHAT SCHEDULING MUST BALANCE

Orders and their dates Capacity Material availability Changeover time Stock levels

WHAT TO ESTABLISH

Whether you produce to order or to stock.

WHAT MAKE-TO-ORDER PROVIDES

No unsold stock.

WHAT IT COSTS

Longer delivery times, and less efficient runs.

WHAT MAKE-TO-STOCK PROVIDES

Immediate availability and efficient runs.

WHAT IT RISKS

Producing what does not sell.

WHAT MOST OPERATIONS DO

Both: stock for predictable lines, order for the rest.

WHAT TO ESTABLISH

Which lines are which.

HOW

From demand predictability.

WHAT TO PLAN

Runs long enough to be efficient, short enough not to create excess stock.

WHAT TO GROUP

Products sharing setup.

WHY

It reduces changeover time substantially.

WHAT TO CHECK BEFORE SCHEDULING A RUN

Material available Equipment available People available Packaging available

WHY PACKAGING SPECIFICALLY

It is routinely forgotten and it stops despatch.

WHAT TO ESTABLISH

A schedule communicated to everyone: production, stores, despatch.

WHAT TO TRACK

Adherence to schedule Reasons for deviation

WHAT DEVIATIONS REVEAL

Unrealistic scheduling, or upstream problems.

WHAT TO AVOID

Changing the schedule constantly.

WHY

It destroys efficiency and nobody can plan around it.