Knowledgebase

Managing Production Waste and Yield Print

  • 0

Getting more output from the same input.

WHAT YIELD MEASURES

Output as a proportion of input.

WHY IT MATTERS

Material is usually the largest cost, and yield improvement goes straight to profit.

WHERE LOSSES OCCUR

Process waste inherent in the method Setup and startup waste Defects and rework Spillage and handling Trimming and offcuts Theft

WHAT TO MEASURE SEPARATELY

Each of those.

WHY SEPARATELY

They require different responses.

WHAT TO DO ABOUT SETUP WASTE

Reduce changeovers, and refine the startup procedure.

WHAT TO DO ABOUT INHERENT PROCESS WASTE

Establish whether it can be reduced by method or equipment change.

WHAT TO DO ABOUT DEFECTS

Address the cause.

WHAT TO ASK

Whether waste can be recovered or reused.

WHAT EXAMPLES LOOK LIKE

Offcuts reprocessed Off-specification product downgraded and sold By-products sold

WHY THAT MATTERS

It converts a cost into a recovery.

WHAT TO ESTABLISH

Whether downgraded product may be sold, and under what description.

WHY CAREFULLY

Selling substandard product as prime is fraud and it destroys reputation.

WHAT TO RECORD

Waste by category, per run.

WHAT TO SET

A yield target, based on what is achievable.

WHAT TO REVIEW

Runs that fell below it, and why.

WHAT TO TRACK

Yield trend over time.

WHAT A FALLING TREND INDICATES

Material quality, equipment condition, or process drift.


Was this answer helpful?
Back

Are you happy with your experience? Leave us a review on Trustpilot.


Trustpilot