Knowledgebase

Managing Print Production and Scheduling Print

  • 0

Getting work through.

WHAT DETERMINES THROUGHPUT

Machine availability Setup time Finishing capacity Artwork readiness Approval delays

WHY APPROVAL DELAYS DOMINATE

Jobs sit waiting for customers, occupying the schedule.

WHAT TO TRACK PER JOB

What it is waiting for Who it is waiting on The promised date

WHAT TO ESTABLISH

That jobs awaiting approval do not block production planning.

WHAT TO SEQUENCE

Jobs using the same material or setup together.

WHY

It reduces setup time and waste substantially.

WHAT TO ESTABLISH

Realistic turnaround times, by product.

WHY REALISTIC

Optimistic promises produce failures, and printing deadlines are frequently tied to events.

WHAT TO QUOTE

A date you can meet with margin.

WHAT TO ESTABLISH ABOUT RUSH JOBS

A premium, and whether you accept them at all.

WHY A PREMIUM

They displace other work and consume setup out of sequence.

WHAT TO DO WHEN A JOB WILL BE LATE

Tell the customer immediately.

WHY

Print is usually for a fixed occasion.

WHAT FINISHING INVOLVES

Cutting, laminating, binding, mounting, eyeleting, installation.

WHY IT IS FREQUENTLY THE BOTTLENECK

It is manual and it is under-resourced.

WHAT TO MEASURE

Time from order to delivery Jobs late, and why Reprints, by cause