Pricing Construction Work Print

  • 0

Estimating before you know.

WHAT AN ESTIMATE MUST COVER

Materials Labour Plant and equipment Subcontractors Site costs Overheads Profit Contingency

WHAT MOST ESTIMATES OMIT

Site establishment and security Waste and breakage Transport of materials Supervision time Rectification of defects The contractor's own time

WHY THOSE MATTER

They are real and they consume the margin.

HOW TO BUILD AN ESTIMATE

From quantities, item by item.

WHAT TAKING OFF QUANTITIES MEANS

Measuring from the drawings what is actually required.

WHY FROM DRAWINGS

Estimating by impression is how contractors lose money.

WHAT TO APPLY TO QUANTITIES

Current material prices Labour required per unit Wastage allowance

WHY WASTAGE ALLOWANCE

Materials are cut, broken, stolen and over-ordered.

WHAT TO ESTABLISH

Your own labour rates per unit of work.

HOW

From records of previous jobs.

WHY YOUR OWN

Published rates do not reflect your crew.

WHAT CONTINGENCY IS FOR

What you cannot foresee.

HOW MUCH

More on renovation, less on repeat work you know.

WHAT TO STATE IN THE QUOTATION

What is included What is excluded What is provisional What assumptions you relied on Validity period

WHY ASSUMPTIONS

If they prove wrong, the price changes, and the document must say so.

WHAT TO NEVER DO

Price to win, intending to recover through variations.