Controlling what you buy.

WHY IT MATTERS

Materials are the largest cost and the largest loss.

WHERE LOSSES OCCUR

Over-ordering Waste and breakage Theft Deterioration Use on other jobs

WHAT TO ORDER

From calculated quantities, plus a wastage allowance.

WHY NOT EXCESS

Excess on site is stolen, damaged or left behind.

WHAT TO ESTABLISH ABOUT DELIVERY

Timing, so materials arrive when needed.

WHY NOT EARLY

Early delivery means longer exposure to theft and weather.

WHAT TO CHECK ON DELIVERY

Quantity against the order Quality and specification Condition

WHO CHECKS

A named person, who signs.

WHAT TO RECORD

Every delivery, against the job.

WHAT STORAGE REQUIRES

Secure area Protection from weather Separation of materials that deteriorate

WHAT DETERIORATES

Cement, in damp conditions Timber, if unprotected Paint and chemicals, past their dates

WHAT REDUCES THEFT

Secure storage Issuing materials against requisition Counting regularly Site security Limiting stock on site

WHY ISSUING AGAINST REQUISITION

It makes consumption visible.

WHAT TO RECONCILE

Materials purchased against work completed.

WHAT DIFFERENCES REVEAL

Waste, theft or over-ordering.

WHAT TO DO ABOUT SURPLUS AT COMPLETION

Return it, or transfer it to another job and record it.