Knowledgebase

Planning Resource Requirements Print

  • 0

What the strategy needs.

WHAT TO ESTABLISH

What the plan requires: people, money, equipment, systems, premises.

WHY

Strategies fail on resources more often than on logic.

WHAT TO ASSESS FOR PEOPLE

What roles are required What skills When they are needed Whether they exist internally What they cost

WHAT TO PLAN FOR

Time to recruit and time to become productive.

WHY

Both are longer than expected.

WHAT TO ASSESS FOR MONEY

How much is required When For what Where it comes from

WHAT TO IDENTIFY

The point of maximum cash requirement.

WHY

It determines feasibility.

WHAT TO ASSESS FOR SYSTEMS

What works at current scale What breaks at the planned scale

WHY

Systems that work informally fail at volume, and the failure appears suddenly.

WHAT COMMONLY BREAKS

Record-keeping Stock control Collection Communication Quality control

WHAT TO ESTABLISH

At what point each requires change.

WHAT TO SEQUENCE

Investment, so capability arrives before it is needed but not long before.

WHY THAT BALANCE

Too early wastes cash; too late produces failure.

WHAT TO PHASE

The plan, in steps with review points.

WHY

It allows stopping.

WHAT TO ESTABLISH AT EACH REVIEW

Whether to continue, adjust or stop.


Was this answer helpful?
Back

Are you happy with your experience? Leave us a review on Trustpilot.


Trustpilot