Understanding Building Approvals Print

  • 0

Permission to build.

WHAT IS TYPICALLY REQUIRED

Building plan approval from the relevant authority Compliance with development control regulations Sometimes environmental approvals Inspections during construction

WHY IT MATTERS

Building without approval risks demolition, penalties and inability to sell.

WHAT APPROVAL TYPICALLY REQUIRES

Title documentation for the land Drawings prepared by qualified professionals Structural design and calculations Payment of fees Assessment

WHY QUALIFIED PROFESSIONALS

Approval requires designs certified by registered practitioners.

WHAT TO ESTABLISH BEFORE DESIGNING

What the development control rules permit: coverage, height, setbacks, use.

WHY BEFORE

A design that cannot be approved wastes the fees and the time.

WHAT TO PLAN FOR

The approval period, which is substantial.

WHAT INSPECTIONS TYPICALLY OCCUR

At defined stages during construction.

WHAT TO ESTABLISH

When they occur and what they examine.

WHY

Proceeding past a stage without inspection can require opening work.

WHAT TO KEEP

The approved drawings and the approval itself.

WHY

They are required at sale and if anything is questioned.

WHAT TO DO ABOUT CHANGES DURING CONSTRUCTION

Establish whether they require re-approval.

WHAT TO ADVISE CLIENTS

That approval is their obligation, unless agreed otherwise.

WHAT TO PUT IN THE CONTRACT

Who obtains approvals, and what happens if they are not obtained.

WHY

Contractors are otherwise blamed for a delay they did not cause.