Handling Time and Scheduling in Integrations Print

  • 0

When things happen.

WHAT TO AGREE WITH ANY PROVIDER

The time standard used in their timestamps.

WHY

Ambiguous timestamps produce records dated wrongly.

WHAT TO STORE

A single universal standard, converting at presentation.

WHAT TO BE CAREFUL WITH

Timestamps with no offset Providers using their own local time Daylight saving transitions

WHAT SCHEDULED INTEGRATIONS MUST HANDLE

Runs that overlap Runs missed because the system was down Clocks differing between systems

WHAT PREVENTS OVERLAP

A lock, released on completion.

WHAT TO DO ABOUT MISSED RUNS

Process from the last watermark, not from a fixed window.

WHY

A fixed window loses everything from the missed period.

WHAT A WATERMARK IS

The point processing reached, stored durably.

WHEN TO UPDATE IT

After successful processing.

WHAT TO ADD TO SCHEDULES

A small random offset.

WHY

It avoids every integration firing on the same second.

WHAT TO CONSIDER ABOUT PROVIDER MAINTENANCE WINDOWS

Scheduling around them.

WHAT TO MONITOR

Whether each scheduled run occurred.

WHAT TO ALERT ON

A run that did not happen.

WHY

It is more common, and less visible, than a run that failed.