Scope and Phasing Print

  • businesssystems, business, guide, howto, solution, zillionkinghost, hosting, support
  • 0

Deciding what to do when.

WHY PHASING WORKS

Smaller changes are absorbed; large ones overwhelm.

WHAT TO INCLUDE IN A FIRST PHASE

The core process that must work The minimum to operate Nothing optional

WHAT TO DEFER

Advanced features Secondary processes Nice-to-have reporting Integration that is not essential

WHY DEFERRAL IS NOT FAILURE

It is how projects finish.

WHAT SCOPE CREEP LOOKS LIKE

Requirements added during implementation Small requests accumulating Processes discovered late

WHY IT IS INEVITABLE

Discovery reveals what was not known.

WHAT TO ESTABLISH

A change process: request, assess, decide.

WHAT ASSESSMENT SHOULD STATE

Cost, time, and effect on other work.

WHO DECIDES

The sponsor, explicitly.

WHAT TO REFUSE

Changes accepted informally, without assessment.

WHY

They accumulate invisibly until the timeline is unachievable.

WHAT BIG BANG MEANS

Everything switching at once.

WHAT PHASED MEANS

Modules or locations going live progressively.

WHAT THE TRADE-OFF IS

Big bang is riskier but avoids running two systems; phased is safer but requires parallel operation.

WHAT TO CHOOSE

Phased, unless parallel operation is impossible.


Was this answer helpful?
Back

Are you happy with your experience? Leave us a review on Trustpilot.


Trustpilot