Estimating Testing Effort Print

  • softwaretestingqa, software, guide, howto, solution, zillionkinghost, hosting, support
  • 0

Judging how long it takes.

WHAT DRIVES EFFORT

Scope of change Complexity Quality of what is delivered Environment availability Number of configurations

WHY DELIVERY QUALITY MATTERS

Testing a defective build takes far longer, because of reporting and retesting cycles.

WHAT TO ESTIMATE SEPARATELY

Test design Execution Defect reporting and retesting Regression

WHAT TO ADD

Contingency for retesting, which is always needed.

HOW MUCH

A substantial proportion, based on historical defect rates.

WHAT TO BASE ESTIMATES ON

Previous similar work, where records exist.

WHY RECORDS MATTER

Estimates without history are guesses.

WHAT TO TRACK

Actual effort against estimate, to improve future ones.

WHAT TO STATE WITH ANY ESTIMATE

The assumptions it rests on.

WHAT THE COMMON ASSUMPTIONS ARE

The environment is available The build is testable Requirements are stable Defect volume is typical

WHAT TO DO WHEN ONE FAILS

Revise the estimate, and say so immediately.

WHAT TO RESIST

Estimates set by the date rather than the work.

WHAT TO OFFER INSTEAD

What can be tested in the time available, and what the residual risk is.