Physical installation.

WHAT TO PREPARE

The rails or mounting hardware The correct tools Labels An updated elevation diagram

WHAT TO CHECK BEFORE STARTING

That the position is free and correct That power and network are available That the equipment fits the rack depth

WHAT TO DO

Install rails first, verifying they are level Mount the equipment with assistance for anything heavy Connect power to both distribution units, on separate paths Connect network to both switches, where redundant Label every cable at both ends

WHAT TO VERIFY BEFORE LEAVING

That the equipment powers on That both power supplies are live That network links come up That it is reachable by its management interface

THAT LAST POINT

Verify remote management works while you are still there.

WHY

Otherwise the next problem requires another visit.

WHAT TO TIDY

Cables, routed and secured, with excess managed.

WHAT TO REMOVE

All packaging, from the hall.

WHAT TO UPDATE

The inventory and the elevation diagram, before leaving.