Network aspects of relocation.

WHAT TO ESTABLISH EARLY

What connectivity is available at the new address Lead times for installation

THE LEAD TIME POINT

Connection installation frequently takes far longer than people allow.

Order it as early as possible.

WHAT TO PLAN

Cabling, before fit-out Where equipment will live Wireless coverage for the new layout

WHAT TO ARRANGE

Overlap between the old and new connections, if possible

WHY

It allows a phased move rather than a day with nothing working.

WHAT TO CHECK BEFORE MOVING DAY

That the new connection is live and tested That equipment is labelled That you have the configuration documented

WHAT TO UPDATE AFTERWARDS

Your address on record with services restricted by address Documentation

THAT FIRST ONE

Anything restricted to your old public address stops working.

Identify those before the move.

WHAT TO TEST ON ARRIVAL

Everything, systematically.

WHAT TO KEEP AVAILABLE

A mobile fallback during the transition.